Fitout Duration
8 Months
Client
ECU
Location
Northbridge, WA
Members of our team were proud to contribute to this ongoing project as subcontractors for Cubic, focusing on framing, sheeting, and detailed interior paneling. This included installing timber panels across ceilings and walls, applied over plasterboard to create a refined, high-end finish. Our team also built internal walls using Speedpanel systems and constructed floating walls, over 4 metres high, secured without connection to the floor or ceiling to reduce vibration. Their attention to detail and commitment to quality played a key role in progressing the project toward its December completion.

This project has provided our team members with a unique opportunity to work on a highly detailed and architecturally focused interior. While subcontracting for Cubic, they were responsible for framing, sheeting, and the installation of timber panels across various areas, helping to shape the aesthetic character of the space. The ceiling and wall paneling added a layer of visual warmth and sophistication, blending seamlessly with the broader design vision.
A standout element of our contribution was the construction of floating walls - over four metres tall and engineered without direct connection to the floor or ceiling. These were supported using specialised brackets and acoustic foam to reduce vibration and enhance acoustic performance. Our team also worked with Speedpanel systems for internal wall builds, ensuring a consistent, high-quality result. While the project is still underway and set for completion in December, we’re proud to have played a part in its progress and look forward to seeing the finished space come to life.